Lifting stage machinery is the stage commonly used in the form of stage, we need to protect the most is its safety. If there is a deviation in the installation, it is very easy to cause safety accidents. Let's take a look at the installation process of the lifting stage machinery. The specific operation is as follows:
1. Before building the lifting platform equipment, two supporting legs can be roughly built on the ground;
2. Insert the diagonal pull rod on both sides into the pin on the leg table equipment without check valve;
3. Buckle the platform rack into the U-shaped groove above the support leg to complete the assembly of the first group of platforms;
4, put a leg and discharge;
5. Connect the original leg with two sets of oblique pull rods to fix the leg;
6. Lave the photo frame again. The two photo frames share one leg in the middle. The two photo frames are put into the U-shaped groove.
Key words:
Related News
Service Hotline:
400-888-1295
E-mail:
444518804@qq.com
Service Hotline:
Company Address:
313 Xinhua Road, Xinhua District, Shijiazhuang City, Hebei Province
Focus On Us